14 2 wg 14 gauge 2 conductors with ground etc.
Underground service entrance cable requirements.
12 2 12 gauge 2 conductors.
Single phase underground service meter installation figure 9.
Single mobile home underground service pressure treated post figure 9a.
Al aluminum conductor.
Current transformer cabinets overhead or underground service window type ct s figure 11.
14 2 14 gauge 2 conductors etc.
According to 338 2 there are two types of service entrance cables.
Nec 300 5 underground wiring conduits and raceways direct buried cable or conduit or other raceways shall meet the following minimum cover requirements.
Service entrance disconnect and location shall conform to the latest version of the nec and all local ordinances.
In general bury the nonmetallic conduits 18 inches below grade or 12 inches if protected by 2 inches of concrete or equivalent.
600 v maximum voltage rating for typical residential nm electrical cable.
At 24 inches you can bury underground feeder cable using pvc conduit to 18 inches below ground only where the wire comes up.
5trenches to be in as straight and direct a line as possible.
For service entrances of 201 to 400 amperes as determined by the nameplate ampacity of the service disconnect a rain tight current transformer enclosure constructed of code gauge metal with an approved mounting base for bar type current transformers shall be used.
For overhead service weather head must be a minimum of three feet above the roof.
Conduits installed less than 36 inches in depth require cooperative engineering approval and shall beencased in concrete to cooperative specs depths specified are to finished grade.
Single mobile home underground service alternate meter pedestal figure 10.
How to translate the electrical wire markings on nmc cable.
A disconnecting means must be provided for all.
Direct burial cable rigid or intermediate metal conduit non metallic raceway pvc 24 inches 6 inches 18.
Minimum 6 copper ground wire securely stapled to wall.
4conduit minimum depth 36 inches.
Cu copper.
For underground service the poured footing must be notched out for the conduit.
Meter base mounted on exterior wall of house or mobile manufactured home.
Any conduit crossing under a road shall be schedule 80.